京港高铁雄商段(郑州局管段)开始运行试验

闽南乡音跨越山海 中菲友谊再谱新篇 2026世界闽南语金曲盛典全球启动仪式 在马尼拉隆重举行

台湾自媒体人:新疆文旅总能推陈出新

中国(绵阳)科技城加快建设科技创新先行区

“跟着作家去旅行” 中国暑期游渐兴多元文化路径

巴黎再度拉响高温红色警报 全法131人溺水丧生

4,000-ton steel structure lends Guangzhou Baiyun Railway Station petal appeal

发布时间:   来源: Ecns.cn

(ECNS) -- A 4,000-ton steel structure of Guangzhou Baiyun Railway Station, a major transport hub for Greater Bay Area, has been completed, lending the station a flower-petal look.

The railway station was inspired by Kapok, the city flower of Guangzhou, Guangdong Province.

It will receive all conventional-speed trains of Guangzhou Railway Station and Guangzhou East Railway Station after completion.

The project is expected to be finished by the end of 2023.

上一篇:Chinese researcher-led project endorsed in UNESCO Ocean Decade Actions
下一篇:WorldSkills Shanghai 2022 canceled

首页   |   

Copyright © http://www.odtyn.com 法国青年网 版权所有